Autoplay
Autocomplete
Previous Lesson
Complete and Continue
8-Hour Site Safety
Welcome
For the best online experience
SAFCO Policy statement
What is SAFCO? (1:05)
SAFCO Credentials
Course Outline
Learning Objectives
Methodology
This course only gives a CERTIFICATE
REFUND
Tech Support
8-Hour Site Safety
DOB (0:06)
SAFCO CONSTRUCTION SERVICES
SAFCO'S POLICIES
SAFCO'S POLICIES PART 2
OBJECTIVES & OUTLINE (0:04)
LEARNING OBJECTIVES
LEARNING OBJECTIVES PART 2
LEARNING OBJECTIVES PART 3
COPY RIGHTS
8-Hour Site Safety
Instruction Outline
INTRODUCTION: GROUND RULES & LOGISTICS (0:06)
INTRODUCTION: TELL US ABOUT YOURSELF
INTRODUCTION: LEARNING OBJECTIVES (0:37)
INTRODUCTION: IMPORTANT DISCLAIMER (0:16)
INTRODUCTION: IMPORTANT DISCLAIMER PT 2 (0:54)
INTRODUCTION: AGENDA (0:03)
SECTION 1: INTRODUCTION
SECTION 1: INTRODUCTION (0:03)
Chapter 33 of the New York City Building Code (0:16)
NYC Department of Buildings Website nyc.gov/nycsafety (0:06)
Local Law 196 of 2017 (0:36)
Information Signs (0:57)
New York City Building Industry Notices: (0:05)
New York City Building Industry Notices:
Quiz
SECTION 2: CHAPTER 33 GENERAL
Section 2: Chapter 33 General (0:04)
Scope (0:23)
Fire Code (0:13)
Manufacturer Specifications (0:18)
Safety Measures and Safeguards (0:25)
Site Safety Managers, Coordinators and Superintendent of Construction (0:29)
Inspections (0:34)
Inspections PT 2 (0:06)
Unsafe Conditions and Equipment (0:19)
Documents to be Kept on Site (1:05)
Documents to be Kept on Site PT 2 (1:00)
Accidents and Damage to Adjoining Property (0:22)
Use and Tampering Prohibited (0:46)
SECTION 3: SELECTED DEFINITIONS
SELECTED DEFINITIONS (0:04)
ACCIDENT (0:55)
COMPETENT PERSON (0:29)
CRANES (0:24)
CRITICAL PICK (1:02)
DERRICK (0:26)
DEWATERING (0:13)
HANDHELD DEVICE (DEMOLITION) (0:38)
HOISTING EQUIPMENT (0:13)
LOAD (WORKING) (0:17)
MAJOR BUILDING (0:21)
MOBILE SCAFFOLD (0:09)
Ariel lifts are NOT MOBILE SCAFFOLDS (0:04)
QUALIFIED PERSON (0:21)
REGISTERED DESIGN PROFESSIONAL (0:07)
SCAFFOLD CONTROLLING ENTITY (0:12)
SOIL AND FOUNDATION WORK (0:23)
SUSTAINED WIND (0:07)
UNENCLOSED PERIMETER (0:16)
WALKABLE FLOORS (0:27)
WORKING DECKS (0:24)
SECTION 4: SAFEGUARDS AND MAINTENANCE OF SITE
SECTION 4: SAFEGUARDS AND MAINTENANCE OF SITE (0:05)
Scope (0:11)
Utilities (0:18)
Maintaining Essential Services (0:04)
Electrical Work (0:06)
Sanitary Facilities (0:11)
Removing, Relocating, or Interrupting Services (0:23)
Watchperson (0:55)
Watchperson Exceptions (0:39)
Housekeeping (0:12)
Slipping and Tripping Hazards (0:17)
Maintenance (0:26)
Hose Lines, Wires, Ropes, Pipes, Chains, and Conduits (0:29)
Containers (0:55)
How does this look? (0:02)
Control of Debris (0:50)
Storage of Materials and Equipment (0:18)
Open and Exposed Areas (0:16)
Storage near unenclosed perimeters (0:25)
Storage near unenclosed perimeters Exceptions (0:38)
Storage near unenclosed perimeters Exceptions PT 2 (1:20)
Storage of Combustible Material and Equipment (0:14)
Storage near Sidewalks, Walkways, and Pathways (0:49)
Machinery (0:19)
Removal of Material and Debris (0:11)
Dropping or Throwing Prohibited (0:10)
Clogging (0:21)
Air Pollution (0:11)
Fire-retardant Construction (0:40)
Fire Prevention and Fire Protection (0:27)
Water Supply (0:48)
Fire extinguishers (0:21)
Smoking (0:14)
Sprinkler Systems (0:18)
Sprinklers During Alteration (0:26)
Removal of Damaged Sprinklers by variance ONLY (1:02)
Demolition of Standpipe (0:24)
Free from Obstruction (0:15)
Use of standpipes for purposes other than supplying water for firefighting (0:31)
Use of standpipes for purposes other than supplying water for firefighting PT 2 (0:19)
Tenant Protection Plans & Occupant Protection Plans (0:26)
Operations in Occupied Buildings (0:26)
Stairs During Construction or Demolition (1:03)
Elevators and Hoists During Construction or Demolition (0:21)
Publicly Accessible Floors (0:16)
Floors Closed to the Public (0:44)
Quiz
SECTION 5: SOILS, EXCAVATION & UNDERPINNING
SECTION 5: SOILS, EXCAVATION & UNDERPINNING (0:05)
Some New York City Statistics (0:18)
Disturbances to infrastructure (0:12)
ARTICLE
ARTICLE PT 2
ARTICLE PT 3
Anatomy of a Collapse: The Failure Plane (0:05)
Anatomy of a Collapse: Failure Plane Cont’d (0:04)
Anatomy of a Collapse: Failure Plane Cont’d PT 2 pg 108
Anatomy of a Collapse: Failure Plane Cont’d PT 3 pg 109
Anatomy of a Collapse: Failure Plane Cont’d PT 4 pg 110
Anatomy of a Collapse: Failure Plane Cont’d PT 5 pg 111
Anatomy of a Collapse: Failure Plane Cont’d PT 6 pg 112
Anatomy of a Collapse: Failure Plane Cont’d PT 7 pg 113
Anatomy of a Collapse: Failure Plane Cont’d PT 8 pg 114
Anatomy of a Collapse: Failure Plane Cont’d PT 9 pg 115
Protecting an Adjacent Building
Protecting an Adjacent Building PT 2
Means and Methods of Construction: What Goes Wrong (0:16)
Impact of Soil Conditions/Groundwater on Underpinning (0:32)
Impact of Change in Weather on Soil Condition (0:08)
How Can We Avoid Problems? (0:03)
Provide a preconstruction survey of all adjacent properties (0:22)
Vibration Monitoring (0:14)
Vibration monitors (0:16)
Tilt Sensors (0:03)
Color-Coding System for Marking Utilities (0:04)
PHOTO
Explosive Notification to FDNY (0:15)
Fence (0:10)
Guardrail Systems for Excavations (1:09)
Guardrail Systems for Excavations PHOTO
Openings (0:43)
Openings PHOTO
Access (0:10)
Dewatering (0:22)
Dewatering PHOTO 1
Dewatering PHOTO 2
Dewatering PHOTO 3
Dewatering PHOTO 4
Dewatering PHOTO 5
SECTION 6: MATERIAL PLACEMENT AND INSTALLATION.
SECTION 6: MATERIAL PLACEMENT AND INSTALLATION. (0:04)
Scope: MATERIAL PLACEMENT AND INSTALLATION (0:13)
Shop Drawings (0:08)
Shop Drawings PT 2 (0:08)
Field Connections (0:42)
Handling and Storing Materials, All Structural steel members (0:49)
Placing of Structural Members (0:10)
Placing of Structural Members PT 2 (0:57)
Tag-Lines (0:13)
Tag-Lines PHOTO
SECTION 7: Demolition
Section 7: Demolition (0:03)
SECTION BC 3306 (0:14)
Scope (0:17)
Safety Zone Requirements (incl. Commissioner Approval) (0:42)
Safety Zone Requirements (incl. Commissioner Approval) PT 2 (0:25)
PHOTO
Requirements for Notifying DOB (0:15)
Requirements for Notifying Adjoining Property Owners (0:42)
Commissioner Approval Requirements for Mechanical Demolition Equipment (0:29)
PHOTO
Requirements for Shoring/Bracing of Weakened Structures Prior to Demolition (0:36)
Requirements for Shoring/Bracing of Weakened Structures Prior to Demolition PT 2 (0:31)
Demolition Sequence Constraints/Factors to Consider (0:44)
Requirement for Removal of Combustible Content Prior to Demolition (0:25)
Requirements for Removal of Asbestos Prior to Demolition (0:30)
Requirements for the Removal of Glass Prior to Demolition (0:31)
Requirements for Purging Steam and Fuel from Pipes, Tanks, Boilers, or other Devices Prior to Demolition (0:50)
Requirements for Maintenance of Enclosed Vertical Shafts and Stairs During Demolition (0:31)
Requirements for Material Storage During Demolition (1:10)
Requirements for Examining of Party Walls Prior to Imposing Loads on Them (0:41)
Requirements for Shaftways around Floor Openings Used for Debris Removal (1:36)
Completion Work Required Before Sign-Off of Demolition Operations (0:14)
SECTION 8: PROTECTION OF PEDESTRIANS
SECTION 8: PROTECTION OF PEDESTRIANS (0:04)
Scope, Streets, Sidewalks, Walkways (1:10)
Temporary Public Walkway within the Site (1:34)
Pathways & Foot Bridges (1:05)
Requirements for Sidewalks, Temporary Walkways, Foot Bridges, and Pathways (1:08)
Requirements for Sidewalks, Temporary Walkways, Foot Bridges, and Pathways PT 2 (0:58)
Sidewalk Sheds and Fences & Warnings Signs & Obstructions (1:01)
Dangerous Areas (0:32)
Vehicular Traffic (0:30)
Areas Open to Persons other than Workers (0:32)
Work or Storage Zones (1:11)
Design loads & Wind and Other Loads (0:57)
Storage on sidewalk sheds (1:38)
Vertical members and beams (1:27)
Deck (0:56)
Parapet (1:39)
Clear Ceiling Height (0:19)
Lighting (1:25)
Avoid Interference (0:40)
Shed Rest (0:50)
Safe Condition (0:41)
Responsibility for Maintenance and Use (0:29)
Storage or Placement of Items (0:46)
Installation inspection (0:52)
Periodic Inspection (0:48)
Inspection following an Adjustment or Repair (0:27)
Daily Inspection (0:44)
Daily Inspection PT 2 (0:41)
Notification of Removal (0:12)
Fences (0:47)
Fences PT 2 (0:59)
Location of Fence (1:03)
Location of Fence PT 2 (0:30)
Gates (0:46)
Viewing Panels (0:44)
Chain Link Fences or Gates (0:45)
Chain Link Fences or Gates PT 2 (0:48)
Design of Fences (0:34)
Installation and removal of fences (0:41)
Condition of Fences (0:31)
SECTION 9: PROTECTION OF UNENCLOSED PERIMETERS
Section 9: Protection of Unenclosed Perimeters (0:05)
Scope (0:28)
Permit (0:22)
Safety Netting Design and Documentation (0:43)
Safety Netting Design and Documentation PT 2 (1:03)
Site Safety Plans (0:48)
Flame Retardant (0:42)
Tensile Strength (1:04)
Responsibility and Supervision (0:42)
Vertical Safety Netting Systems (0:36)
Vertical Safety Netting Systems PT 2 (0:54)
Vertical Safety Netting Systems PT 3 (0:45)
Openings (0:25)
Cables (0:43)
Cables PT 2 (0:43)
Taut Systems & Friction Connections (0:24)
Temporary Removal (0:43)
Temporary Removal PT 2 (0:21)
Restoring Nets & Permanent Removal (0:40)
Horizontal Safety Netting Systems (0:23)
During Construction (0:57)
During Demolition (0:32)
During Façade Construction, Alteration, Maintenance, or Repair (1:04)
Hoisting Area (0:52)
Permanent Removal (0:59)
Horizontal Safety Netting Systems Requirements (0:57)
Tensile Strength Test (1:05)
Identification of Nets (0:32)
Guardrail System (0:55)
Components (0:38)
Height of Railings and Toeboard (0:38)
Dimensions and Materials (0:47)
Dimensions and Materials PT 2 (0:52)
Dimensions and Materials PT 3 (0:42)
Exceptions (0:43)
Exceptions PT 2 (0:30)
Horizontal Gap (0:36)
Temporary Removal (0:51)
Restoring Guardrails (0:38)
Modifications and Alternative Systems (0:37)
Request Content (0:53)
Unenclosed Perimeter Protection Inspection, Use, Adjustment, Maintenance, and Repair (0:28)
Safe Condition (1:03)
Inspections (1:31)
Repair (0:40)
Quiz
SECTION 10: PROTECTION OF ADJACENT PROPERTY
SECTION 10: PROTECTION OF ADJACENT PROPERTY (0:04)
Protection Required (0:26)
Physical Examination (0:36)
Soil or Foundation Work Affecting Adjoining Property (1:09)
Support of Party Walls (0:51)
Preconstruction Survey (0:27)
Monitoring (0:32)
Monitoring PT 2 (0:24)
Potential Hazard (0:25)
Underpinning (0:54)
Subsurface Operations Affecting Adjacent Properties (0:38)
Change in Ground Water Level (0:22)
Retaining Structures (1:14)
Weatherproof Integrity of Adjoining Buildings (0:35)
Weatherproof Integrity of Adjoining Buildings PT 2 (0:45)
Protection of Roofs (1:04)
Protection of Roofs PT 2 (0:37)
Protection of Trees (0:32)
Deleterious, Caustic, or Acid Materials (0:45)
Protection of Adjoining Equipment and Spaces (1:37)
SECTION 11: MAJOR BUILDINGS
SECTION 11: MAJOR BUILDINGS (0:03)
Requirements for the construction or demolition of major buildings (0:33)
Requirements for the construction or demolition of major buildings (0:31)
Applicability of Other Laws (0:39)
Site Safety Monitoring Program (0:36)
Site Safety Manager or Coordinator to Be Designated (0:57)
Site Safety Manager or Coordinator to Be Designated PT 2 (0:43)
Notification to the Department of the Primary Manager or Coordinator (0:38)
Presence at the Site (0:52)
Presence at the Site Exceptions (1:16)
Acting Primary Site Safety Manager or Coordinator (0:30)
Limitation on primary site safety manager or coordinator serving at another site (1:09)
Contractor Shall inform Personnel (1:04)
Contractor Shall inform Personnel PT 2 (0:38)
Site safety manager’s and coordinator’s duties (0:46)
Notification of Violations (1:13)
Notification of Conditions to the Department (1:17)
Notification of Conditions to the Department PT 2 (1:13)
Responsibility (0:52)
Site Safety Manager or Coordinator Standpipe Inspection Responsibilities (0:41)
Weekly Checks (0:27)
Record of Inspections (1:03)
Record of Inspections PT 2 (0:53)
Recording Inspections in the Site Safety Log (0:46)
Site Safety Log (0:53)
Permit log (0:41)
Concrete Safety Manager (1:12)
Concrete Safety Manager PT 2 (0:41)
Orientation and Training (0:34)
Site safety training required (1:50)
Site safety training required PT 2 (0:32)
Modifications to the Site Safety Monitoring Program (0:59)
Request Content (0:42)
Request Content PT 2 (1:32)
Quiz
SECTION 12: SCAFFOLDS
SECTION 12: SCAFFOLDS (0:03)
Requirements for Electrical Work on Supported Scaffolds (0:10)
Requirements for Scaffold Height, Permits, and Platform Tie-Downs (0:49)
Requirements for guardrails and netting on scaffolds (0:19)
Requirements for Vertical Debris Netting on Scaffolds cont’d (1:06)
SECTION 13: STRUCTURAL RAMPS, RUNWAYS AND PLATFORMS
SECTION 13: STRUCTURAL RAMPS, RUNWAYS AND PLATFORMS (0:05)
Ramps and runways (1:18)
Ramps and runways PT 2 (1:43)
Ramps and runways PT 3 pg 320 (1:42)
Ramps and runways PT 4 pg 321 (0:54)
Ramps and runways PT 5 pg 322 (1:33)
SECTION 14: HOISTING EQUIPMENT (BC 3316)
SECTION 14: HOISTING EQUIPMENT (BC 3316) (0:05)
HOISTING EQUIPMENT (0:37)
HOISTING EQUIPMENT PT 2 (1:22)
HOISTING EQUIPMENT PT 3 (1:02)
HOISTING EQUIPMENT PT 4 (1:28)
HOISTING EQUIPMENT PT 5 (1:42)
SECTION 15: MATERIAL HOISTS & BUCKET HOISTS (BC 3317)
SECTION 15: MATERIAL HOISTS & BUCKET HOISTS (BC 3317) (0:07)
Material hoists and bucket hoists (0:51)
Material hoists and bucket hoists pt 2 (1:17)
SECTION 16: PERSONNEL HOISTS (BC 3318)
Section 16: Personnel Hoists (BC 3318) (0:06)
Personnel hoists (0:48)
Personnel hoists PT 2 (0:37)
Personnel hoists PT 3 (0:54)
SECTION 17: CRANES AND DERRICKS
SECTION 17: CRANES AND DERRICKS (0:04)
Cranes and Derricks (1:09)
Certificates of Approval (0:41)
Certificates of Operation (1:59)
Certificates of on-site (1:52)
Certificates of Approval (0:31)
Tower and climber cranes (1:25)
The plan (1:08)
The plan pt 2 (1:14)
The general contractor (1:25)
The general contractor pt 2 (0:29)
The erection, jumping, climbing, and dismantling operations (1:45)
Slings (2:11)
3319.10.2 (0:30)
3319.11 (1:03)
3319.12 (1:18)
3319.13.2 (1:47)
SECTION 18: Material Handling Equipment
SECTION 18: MATERIAL HANDLING EQUIPMENT (0:04)
Material handling equipment (0:57)
3320.3.1 Loading of material handling equipment (0:55)
3320.3.2 Refueling of material handling equipment (0:51)
3320.4 The owner or person directly in charge of any material handling equipment shall immediately notify the commissioner (0:27)
3320.5 Conveyors (1:04)
3320.6 Trucks (0:55)
3320.7 Power buggies (0:55)
3320.7 Power buggies PT 2 (1:14)
3320.8 Lift and fork trucks (1:03)
3320.9 Hand propelled vehicles (0:34)
3320.11 Jacks shall meet the requirements (1:13)
REVIEW
Key Takeaways: Review (0:03)
Key Takeaways (0:19)
ASSESSMENT
TEST YOUR KNOWLEDGE: (0:04)
Final Exam
CONCLUSION
COURSE DEBRIEF: CONCLUSION (0:04)
Course Debrief
FEEDBACK
Social Media
Thank you!
Certificate
3320.4 The owner or person directly in charge of any material handling equipment shall immediately notify the commissioner
Lesson content locked
If you're already enrolled,
you'll need to login
.
Enroll in Course to Unlock